Installation process

Six documented steps. No mystery between arrival and handoff.

The installer follows the model instructions, local requirements, and a completion checklist tailored to smart toilet functions.

1

Confirm fit

Review rough-in, shutoff valve, GFCI outlet, clearances, delivery path, and model requirements.

2

Protect the space

Prepare the work area, shut off water, protect flooring, and document existing conditions.

3

Remove old toilet

Disconnect, drain, lift out the fixture, inspect the flange, and remove old sealing material.

4

Set the smart toilet

Install the required seal and hardware, position the unit, level it, and secure it correctly.

5

Connect & configure

Connect water and approved power, pair controls, and configure comfort and hygiene settings.

6

Test & hand off

Check flushing, washing, drying, heating, sensors, remote control, leaks, and user operation.

Final function testFlushWash modesDryerHeated seatRemoteFoot sensorAuto lidLeak check
Check availability